Commercial office renovation - Toronto & GTA

Commercial office renovations that respect your team and tenants

If your office space feels dated, underused, or hard to work in, we help you re-plan and renovate it so it fits how you actually operate without turning the whole floor into a construction zone.

See how the process works
  • Phased schedules that work around business hours
  • Protection and daily cleanup in shared corridors and lobbies
  • Clear communication with one main point of contact
Modern commercial office with glass partitions and collaborative seating
120+Office projects completed across the GTA
2-10 weeksTypical on-site renovation window
2-yearWorkmanship warranty on our work

What is happening in your office now

When the office layout and finishes work against how your team actually uses the space

Most commercial clients come to us when their office is technically fine on paper but frustrating to work in day to day.

Spaces that do not match how people work

Meeting rooms that are always booked while open areas sit empty, or private offices that no longer match team structure.

Noise, glare, and comfort issues

Echo, poor lighting, and hot or cold spots make it hard for people to focus or host clients comfortably.

Dated finishes that hurt first impressions

Old carpet, scuffed walls, and yellowed lighting suggest the business is not keeping up, even if your service is.

Previous renovations that disrupted work

Past projects may have overrun, created dust and noise at the wrong times, or left incomplete details for your team to live with.

Our fix: A scoped, sequenced office plan that groups work by zone, aligns finishes and lighting with how each area is used, and schedules noisy or disruptive work in the least painful windows for your team or tenants.

We begin with how you use the office today, who needs quiet, who needs collaboration, and what brand impression you want guests to feel. Then we design and phase the renovation around that reality.

Talk through your office plans
Fast

What to expect

How we renovate your office without derailing the work happening in it

We treat office work as the priority and renovation as the project that needs to fit around it, not the other way around.

  1. Step 1
    1

    Strategy and phasing plan

    We review your floor plan, building rules, and how each zone is used, then build a phasing plan that keeps key areas operating.

  2. Step 2
    2

    Design, finishes, and approvals

    We align with you and any designers on layouts, finishes, and branding elements, and coordinate with property management where required.

  3. Step 3
    3

    Construction by zone

    We protect access paths, complete demolition and build-out area by area, and provide short, predictable windows for noise and disruption.

  4. Step 4
    4

    Punch list and handoff

    We walk each zone with you, complete touch-ups, and make sure your team knows how to use and care for new elements and systems.

Need to align with tenant improvement allowances or corporate branding standards. We can coordinate details and documentation as part of the process.

Key decisions

Office renovation choices that affect productivity and perception

We narrow the decisions that matter most so you get a space that works for focus, collaboration, and client meetings without overcomplicating the project.

Together we look at your team size, mix of remote and in-office work, privacy needs, and client traffic. Then we create a short list of layout and finish options that fit.

  • How people work

    Open, private, and hybrid zones

    When this is best

    Best if your team mix has changed and the current layout no longer fits.

    Key details

    • Rebalancing open areas, focus rooms, and enclosed offices
    • Adding small meeting spaces and phone rooms where they are actually used
    • Planning circulation so people move easily without cutting through focus zones
  • Acoustics and durability

    Flooring, walls, and ceilings

    When this is best

    Important when you need better sound control and easier cleaning.

    Key details

    • Flooring choices that dampen sound and stand up to rolling chairs and traffic
    • Wall finishes that are easy to touch up and keep looking fresh
    • Ceiling treatments that help with acoustics and integrate lighting well
  • Comfort and flexibility

    Lighting and power layout

    When this is best

    Right if you have glare, dark corners, or desks that are always fighting for outlets.

    Key details

    • Layered lighting plans that balance natural light, ambient, and task lighting
    • More logical outlet and data locations for desks, meeting rooms, and shared spaces
    • Control options so different zones can set levels that match how they are used
  • Client impression

    Brand and reception touchpoints

    When this is best

    Ideal for firms that host clients or want a strong branded feel for staff.

    Key details

    • Reception and waiting areas that match your website and marketing materials
    • Feature walls, graphics, or millwork in key sightlines
    • Consistent hardware and finishes that feel intentional throughout

What commercial office renovations typically cost in Toronto

Office projects vary widely. These ranges help frame budgets before we see the space and understand your scope.

Light updates

Refresh and reconfigure

For spaces that keep most walls but need layout tweaks, new flooring and paint, and updated lighting in select zones.

$25,000 - $80,000 per office suite
  • Protection, light demolition, and surface prep
  • New flooring and paint in defined areas
  • Lighting and power adjustments where needed
  • Final cleanup and walkthrough

Custom millwork and extensive glass partition work are scoped separately.

Most projects

Full office renovation

For offices that need full finish replacement, more significant layout changes, and better acoustics and lighting.

$80,000 - $250,000+ per office suite
  • Full demolition of selected walls and finishes
  • Rebuild of partitions, ceilings, and finishes to the agreed plan
  • Mechanical, electrical, and data adjustments to support the new layout
  • Phasing and coordination with building management and security

Large structural changes or base building system upgrades are costed as separate items.

Larger and flagship offices

Multi-tenant and premium spaces

For multi-tenant floors, head offices, or spaces that need high-end finishes and complex coordination.

$250,000+
  • Large scale phasing plans for multiple tenants or zones
  • Premium finishes, fixtures, and custom millwork packages
  • Higher levels of protection and off-hours work as required
  • Support with landlord approvals and documentation

Extensive base building upgrades and specialty systems are scoped with your consultants.

What every itemized quote includes

  • You receive a written scope that separates demolition, build-out, finishes, and allowances for clarity.
  • Protection, basic daily cleanup, and debris removal are included so common areas stay presentable.
  • Any discoveries or requested changes are discussed early with clear cost and schedule impacts.

Quotes are fully itemized with allowances, contingency, and requested add-ons itemized for clarity. No hidden feesever.

What moves pricing

What changes the cost of a commercial office renovation

We go through these items with you during planning so you can decide where to invest and where to keep things simple.

Base building condition

Older buildings or previous unpermitted work may need more repair and coordination before finishes go in.

Amount of layout change

Keeping most walls and systems in place is more predictable than moving cores of offices, kitchens, or meeting rooms.

Finish and millwork level

Standard systems and finishes keep budgets tighter, while heavy glass and custom millwork packages increase cost and lead time.

Work hours and access

Night work, weekend work, and limited loading or elevator access change how we staff and stage the project.

Number of stakeholders and approvals

More parties at the table, such as landlords, corporate design teams, and multiple tenants, often add time for reviews and coordination.

Before you sign off, you will know which of these factors apply to your office and what they mean for budget and schedule.

Get detailed commercial office pricing

Guarantees that keep your office renovation under control

You need a finished office and a team that can still work while it is being built. Our guarantees are built around that balance.

Phasing that protects operations

We plan which zones are offline when so your reception, critical meeting spaces, and key work areas stay available as much as possible.

Protection for shared areas

Corridors, elevators, and lobbies get floor and wall protection, with clear signage so visitors know where work is happening.

Single point of contact

You have one person to call for updates, decisions, and coordination with building management and security.

Respect for business hours

Noisy or disruptive work is scheduled in agreed windows, and we share look ahead information so your team is never surprised.

Warranty and documentation

You receive a workmanship warranty along with simple information on finishes and systems so your facilities team can maintain the space.

The goal is not just a nicer office, but a renovation that feels organized and leaves your team with a space they can be productive and proud in.

Office area cleared and ready for renovation with furniture covered

Preparation

How to prep your office for a smoother renovation

A short list of decisions and communication steps before work starts will make the project easier on your team and visitors.

  • Decide which teams or departments can relocate temporarily while their zone is updated.
  • Identify and label any equipment, IT racks, or furniture that must remain powered or in place.
  • Share building rules for work hours, loading, elevator use, and security procedures.
  • Plan internal communication for staff about what will happen when, using our draft notices if helpful.
  • Confirm who will make final decisions on finishes and changes so questions get answered quickly.

When a commercial office renovation should wait

In some cases, waiting or tackling prerequisites first protects both your budget and your team.

No agreement on scope or priorities

What usually happens

If leadership, tenants, or landlords are pulling in different directions, the project can stall or bounce between revisions.
Our fix
We recommend a short alignment phase to define goals, budget range, and decision makers before design and construction begin.

Unresolved base building issues

What usually happens

Serious mechanical or structural problems in the base building can undo cosmetic upgrades and cause ongoing complaints.
Our fix
We suggest addressing major base building issues first, then designing the office renovation to work with those fixes.

Timelines that fight with quality

What usually happens

Trying to fit a full renovation into a window that is too tight can lead to corner cutting and a space that does not last.
Our fix
We will be honest about what is realistic and may propose phasing or a different start date if the window is not workable.

Commercial office renovation questions we hear most often

Short answers about timing, disruption, and how we work with your building.

1
Can you work at night or on weekends
Yes. Many office projects need off hours work. We can structure schedules around evenings, nights, or weekends and price the impact up front.
2
Will our team be able to work during the renovation
In most cases, yes. We phase work by zone, schedule noisy activities in specific windows, and keep clear paths to key areas like reception, kitchen, and washrooms.
3
Do you coordinate with building management and security
We can handle communication about access, loading, permits, and inspections with your property manager and security team, or work alongside your facilities lead.
4
What if we discover issues once walls or ceilings are opened
If we uncover unexpected conditions, we stop, show you what we found, and lay out options and pricing so you can decide next steps with full information.
5
Do you offer a warranty on the work
Yes. Our renovation work includes a workmanship warranty. If something we installed fails under normal use, we will investigate and make it right.

Have more questions? We're here to help with planning, budgets, and timelines.

Book my commercial office consult

For Homeowners In:

City of Toronto
Mississauga
Brampton
Oakville
Vaughan
Markham
Richmond Hill
Caledon

Offices that now match the way teams work

Feedback from managers and owners across Toronto, Mississauga, and Brampton.

4.9/5 average rating
5.0

I own a barber shop in Brampton. When another highly reputable company screwed me over, I had to hire KDM, and I loved everything they did to build my shop from scratch. They worked day in and day out to make sure the deadline was met and only the best materials went into my barber shop.

Google iconKwabena Fosu

Barber shop build out

5.0

Very affordable and always on time. No work delays. Very good and knowledgeable about the work.

Google iconPatty A African Foods Inc.

Commercial renovation

5.0

Found them on Kijiji and from the start they were professional. They arrived when they said they would and did great work, asking questions about all the right stuff. This was an office demo and I could not be happier.

Google iconDoug Wallace

Office demolition

Ready for an office that fits how you work now

Share how your space is used today and what needs to change. We will map out a practical renovation plan with clear pricing and timelines.

  • Phased plans that respect business hours and building rules
  • Finishes and layouts that support focus and collaboration
  • Warranty backed workmanship across Toronto and the GTA